Monday, May 5, 2008

Day 243: May 5, 2008


day243
Originally uploaded by budandmary
Even with the usual lack of drywall progress, there was quite a bit of action at the house today.

The kitchen's one step closer to tile. Harold Wayne, the tile subcontractor, readied the floor by rolling on some sort of sticky stuff, then putting down wire mesh and, finally, applying the leveler, which is the wet-looking stuff in the photo.

Jimmy wasn't feeling well, but he and Gary finished their part of leveling the kitchen floor before Harold Wayne got started. Then Gary continued to frame the skylights in the sunroom.

Tom, the guys' helper, was back for the first time in a while. He was in charge of cleaning up debris around the outside of the house.

Bud was in mower-maintenance mode, including sharpening blades, changing oil and pressure-washing.